Integrated Laundry Installation

Installation

Tommie Kelly Euronics offers installation services for new integrated laundry appliances, which can be done on the same day as delivery. Having a team of fully trained and experienced professionals who will ensure everything is set up and working properly before leaving. Tommie Kelly Euronics also provides a breakdown of what is included in installation services, as well as some helpful tips on what customers can do to prepare for the installation.

What customers can expect

  1. Unpacking the new appliance & remove packaging
  2. Remove transport bolts holding the drum in place while in transport
  3. Connecting the appliance to a water supply (minimum 1 bar pressure mains supply required)
  4. Connect waste outlet and plug appliance into a standard socket
  5. Levelling appliance & hanging of integrated door onto appliance with hinge kit supplied
  6. Running a cycle test to ensure water is taken in during wash cycle, Water is pumped out during spin cycle & machine goes into full spin mode.
  7. Removal of old appliance for Weee recycling

Tommie Kelly Euronics also provides some tips for customers to prepare for the installation:

  1. Ensure easy access to the kitchen/utility and sufficient space for the new appliance
  2. If not choosing delivery & installation service, make sure the old appliance is out of the way before arrival
  3. Ensure there is a plug socket within 1 meter of where the new appliance will be installed
  4. For washing machine or washer dryer installations, ensure a cold-water supply and waste hose connector are nearby
  5. If installing a washing machine or washer dryer next to a dishwasher, ensure a Y piece is available to split the cold-water supply

Tommie Kelly Euronics aims to make the installation process smooth and hassle-free, while also providing customers with helpful guidance on how to prepare for their installation.

What we don’t cover

Here’s a summary of what’s of what we don’t cover

  1. **Plumbing issues**: If there’s an issue with your plumbing, such as water flow problems or missing necessary parts, the installation service won’t be able to proceed. Installation will need to be rearranged.
  2. **Changes to plumbing**: The service cannot make any changes to the plumbing in your house, so you’ll need to ensure that the plumbing is in good condition before the installation.
  3. **Kitchen unit changes**: The service cannot make significant changes to your kitchen units, so you’ll need to ensure that your new appliance will fit before they arrive. They can only make small amendments if necessary.
  4. **Damaged or poor condition cupboards**: The installation service won’t be able to fit your new appliance if your cupboards are damaged or in poor condition. You’ll need to address these issues before they can proceed with the installation.

By understanding what’s not covered, you can better plan and prepare for your installation and ensure a smooth and successful process.

Will you disconnect my old laundry product?
Yes, this is included as part of installation.

Can you install on a different day to delivery?

Yes, however installaions are generally completed on the same day

Can I add installation after ordering?

Yes no problem

How soon can I have my laundry product installed?

Installation is available 6 days a week, but this depends on your location and what engineers are available.

Do you install on bank holidays?

Sorry, but we don’t install on Bank holidays

How much does integrated laundry installation cost?

Installation for integrated appliance is €99 per product